CityFL
Posted
Sep 10, 2026
Oct 30, 2026
Construction Services Critical Asset Flood Mitigation Projects (Request for Proposals)
Work includes approx 1,188 LF 42" S/CD elliptical/arch other shape, optional material pipe culvert; 51.1 TN traffic B superpave asphaltic concrete; 232 SY performance turf sod; 321 LF 36" CIPP liner; 24 LF replace water main (contractor to verify size)
