School DistrictVA
Posted
-
Oct 2, 2026
REQUEST FOR PROPOSAL DESIGN/BUILD - CENTRAL HIGH SCHOOL POST STEEL BUILDING
Request for Proposal for the design and construction of a new 40' x 80' x 16' post-steel building for Central High School.
Description: DESIGN-BUILD construction of a 28' x 60' x 10' post-steel dressing room/restroom building. Work includes site preparation, stone base, a 4" 4,000 psi concrete slab with reinforcing wire, seamless gutters with downspouts, 3" insulation in roof and walls, 1 set of insulated double doors, 5 3' x 6'8" HD insulated walk doors, 2 concession style roll up doors, and 3 rough plumbing connections for single user restrooms.
SchoolDistrict · VA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
School DistrictVA
Posted
-
Oct 2, 2026
Request for Proposal for the design and construction of a new 40' x 80' x 16' post-steel building for Central High School.
CountyKS
Posted
Aug 10, 2026
Sep 11, 2026
Design Build Pre-Engineered Metal Building. Design Build Contractors to provide planning and construction services for the design and construction of a 200’ x 80’ clear span, pre-engineered metal building.
Higher EducationMN
Posted
Aug 20, 2026
Sep 24, 2026
DESIGN-BUILD. The University has several “mothballed” buildings slated for demolition. The intent of this project is to evaluate the design and associated demolition costs for several buildings, with a particular focus on the Performing Arts Center (“PAC”) and the Engineering and Computing Center (“ECC”), and use the gathered information to select a scope of priority work within the project budget.
Federal Bureau of Investigation
FederalDC
Posted
Aug 26, 2026
Sep 15, 2026
The Contractor shall design, engineer, manufacture, integrate, verify, test, train, deliver, warrant, and support Tier II Mobile Command Post Vehicle (MCPV) systems under a single-award, firm-fixed-price, Indefinite- Delivery/Indefinite-Quantity (IDIQ) contract. The initial delivery order is anticipated to include the nonrecurring design/build effort and one production-representative first-article MCPV trailer. The first article is the only trailer quantity guaranteed by the basic contract. Follow-on production trailers, prime haulers, and other authorized supplies or services will be furnished only when specifically ordered by a funded delivery order. Each MCPV shall be delivered as a complete, integrated, roadworthy, operationally ready command, control, communications, and computer (C4) platform capable of supporting classified and unclassified mission operations when configured with Government-authorized equipment and security controls. The prime Contractor shall remain the Government’s single point of accountability for design authority, systems integration, configuration control, quality, testing, documentation, warranty administration, and lifecycle support, regardless of the use of subcontractors, suppliers, dealers, or original equipment manufacturers. See attached file.
Decision makers connected to this RFP from Wise County School District.