CityWA
-
Closes
Oct 6, 2026
Cushman No. 1 Dam Right and Left-Wing Wall Anchoring (Request for Bids)
Supply, installation, and testing of ten (10) 61-strand restressable post-tensioned tiedown anchors and one (1) verification test anchor at the Cushman No. 1 Dam. Cushman No. 1 Dam Right and Left-Wing Wall Anchoring Project. This project includes the supply, installation, and testing of ten (10) 61-strand restressable posttensioned tiedown anchors and one (1) verification test anchor at the Cushman No. 1 Dam. The production anchors will be installed in the right and left wingwalls of the dam, five (5) per side, and will extend from the dam crest into the bedrock foundation.