Housing Authority of Lafourche Parish
Special DistrictLA
Posted
Oct 3, 2025
Nov 12, 2026
Replacement of Sewer Treatment Plant, Orange Grove Site LA-80-7 (C) RFP
Replacement of sewer treatment plant.
Description: The Housing Authority of Lafourche Parish seeks sealed bids to replace the sewer treatment plant at its Orange Grove Site, LA-80-7 (C). The work includes demolition of the existing facility and design and construction of a new plant with mechanical, electrical, and associated civil work; bids require 5% bid security, and the successful bidder must provide performance and payment bonds equal to 100% of the contract amount. Bids are due November 12, 2026, at 2:00 p.m. CST, and a non-mandatory pre-bid conference is scheduled for November 3, 2026, at the Authority office.
SpecialDistrict · LA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Housing Authority of Lafourche Parish
Special DistrictLA
Posted
Oct 3, 2025
Nov 12, 2026
Replacement of sewer treatment plant.
Housing Authority of Lafourche Parish
Special DistrictLA
Posted
-
Nov 12, 2026
CityOH
Posted
Oct 12, 2026
Nov 5, 2026
The City of Dayton seeks a contractor to remove the existing hot water boilers and boiler recirculation pumps at the Miami Water Treatment Plant and install in-kind replacements. Bids are accepted electronically through QuestCDN, and a pre-bid meeting is scheduled for October 27, 2026, at 10:00 a.m. at the plant. The bid portal is set to open by October 12, 2026, and bids are due at noon EST on November 5, 2026.
East Providence Housing Authority
Special DistrictRI
Posted
Oct 21, 2026
Nov 10, 2026
Work of this contract comprises in general of the existing site containing three buildings that discharge sanitary waste to a gravity sewer system consisting of clay pipes that are in poor condition. The scope of work for the proposed project includes replacement of the existing 6” clay sanitary sewer piping with new 6” pvc sanitary sewer piping. The project proposes to construct the new sewer piping parallel to the existing so that the downtime for sanitary service for the buildings is minimized. Other site improvements include replacement of concrete sidewalks and stair assembly that will be disturbed during the sewer replacement work and construction. Additional information is included on the drawings and within the specifications. The contractor must provide all material, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature and all other services and facilities necessary to complete the construction for the owner, including all incidental work as required or described in the contract documents.