Housing Authority of Lafourche Parish
Special DistrictLA
Posted
Oct 3, 2025
Nov 12, 2026
Replacement of Sewer Treatment Plant, Orange Grove Site LA-80-7 (C) RFP
Replacement of sewer treatment plant.
Description: Work of this contract comprises in general of the existing site containing three buildings that discharge sanitary waste to a gravity sewer system consisting of clay pipes that are in poor condition. The scope of work for the proposed project includes replacement of the existing 6” clay sanitary sewer piping with new 6” pvc sanitary sewer piping. The project proposes to construct the new sewer piping parallel to the existing so that the downtime for sanitary service for the buildings is minimized. Other site improvements include replacement of concrete sidewalks and stair assembly that will be disturbed during the sewer replacement work and construction. Additional information is included on the drawings and within the specifications. The contractor must provide all material, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature and all other services and facilities necessary to complete the construction for the owner, including all incidental work as required or described in the contract documents.
SpecialDistrict · RI, US
Adjacent opportunities open for bidding right now.
Housing Authority of Lafourche Parish
Special DistrictLA
Posted
Oct 3, 2025
Nov 12, 2026
Replacement of sewer treatment plant.
CityTX
Posted
Oct 18, 2026
Nov 5, 2026
Work consist of 100 cy of replacement of embedment, 100 cy of replacement of backfill material, bypass pumping, 992 lf of remove existing 6" sanitary sewer line and replace with new 8" d2241 pr 160 sdr 26 pvc sanitary sewerline, 3 ea of remove existing concrete manhole, and replace with new 4' dia. Concrete manhole, 1 ea of remove existing concrete manhole, and replace with new 4' dia. Concrete drop manhole, 30 vf of additional height beyond six foot base for 4' dia. Manhole risers, 60 lf of bore 8" sewer main, 992 lf of post construction tv inspection of completed sanitary sewer line.
CityOK
Posted
Oct 10, 2026
Nov 10, 2026
Removal and replacement of approx. 320 LF of existing 24" iron sewer trunk line that enters the wastewater treatment plant.
CityCA
Posted
Oct 19, 2026
Nov 23, 2026
Works include approx 30 LF of 8" VCP; 162 LF of CIPP Install Between STA 0+00 and 1+62; Exploratory Subsurface Utility Locating and Excavating (Potholing); Excavation Support System (Trench Excavation Plan and Sheeting, Shoring, and Bracing); Manhole Rehabilitation; Host Pipeline Preparation and Post Repair Inspection Prior to CIPP Install (CCTV)
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from East Providence Housing Authority.