CountyPA
Aug 4, 2026
Closes
Sep 1, 2026
Hvac Building Automation System (BAS)upgrades RFP
Work consist of hvac building automation system (BAS) upgrades.
Description: The project includes the complete demolition and replacement of the HVAC system serving the south wing of the Waggoner Building. This includes the demolition and removal of all associated mechanical equipment, ductwork, piping, controls, and return air plenum. The work also includes complete demolition and replacement of the existing three boilers, three inline boiler pumps, associated flues / air intakes, and piping up to the boiler isolation valves located in the North wing mechanical room.
StateAgency · MO, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Missouri Office of Administration.
Adjacent opportunities open for bidding right now.
CountyPA
Aug 4, 2026
Closes
Sep 1, 2026
Work consist of hvac building automation system (BAS) upgrades.
FederalMD
Aug 17, 2026
Closes
Aug 28, 2026
Work includes removing the current compressors, install two (2) new compressors, perform a startup to ensure system starts up properly, run test to check for freon leaks.
University of North Carolina System
Higher EducationNC
Aug 13, 2026
Closes
Sep 17, 2026
Replace the HVAC system at Bingham Facility Building 2; this solicitation requests contractors to propose construction and HVAC replacement services for the facility. The full solicitation documents are hosted on the buyer's vendor opportunities page and must be downloaded from that official posting for response instructions and attachments. Proposals are due 9/17/2026 and the procurement is open to qualified bidders.
FederalDC
Aug 3, 2026
Closes
Aug 26, 2026
The Contractor shall demo the existing fifteen (15) ton split HVAC equipment. The Contractor shall remove the outdoor condensing unit, refrigerant lines, electrical connections, and all other components associated. The Contractor shall repair all holes on the outside of the building to include all penetrations. The Contractor shall remove and reinstall the drop ceiling on the inside of the ballroom area. The Contractor shall remove the existing indoor air handler above the ceiling, refrigerant lines, electrical connections, electrical disconnect, condensate pan, condensate lines, platform, threaded rod, channel strut, and all other components associated. See attached file.