FederalOH
Aug 11, 2026
Closes
Sep 9, 2026
Replace Chiller 2, B500 (Request for Quotes) Offutt AFB
Replace Chiller 2, B500. This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational replacement unit, including all associated connection piping, controls, and incidental work.