North Carolina Department of Transportation
State AgencyNC
Posted
Sep 21, 2026
Oct 13, 2026
Grading, Drainage, Paving, And Structure, Replace Existing Bridge No. 79 Over Eagle Fork Creek On SR 1171 (Dick Jones Rd)
Work includes 8,100 CY unclassified excavation; 1 ACR supplementary clearing & grubbing; 20 CY drainage ditch excavation; ; 40 ton foundation conditioning material, minor structures; 100 CY foundation conditioning geotextile; 52 LF 15" drainage pipe; 60 LF 15" RC pipe culverts, class iii; 56 lf 15" RC pipe culverts, class iv; 76 LF 18" RC pipe culverts, class iv; 48 LF 15" cs pipe culverts, 0.064" thick; 4 EA cs pipe elbows," thick (15", 0.064"); 200 ton incidental stone base; 450 TON asphalt conc base course, type b25. 0c; 340 TON asphalt conc surface course, type s9. 5b; 45 TON asphalt binder for plant mix. See attached file.
