Open RFPGrading, Drainage, Paving, And Structure, Replace Existing Bridge No. 79 Over Eagle Fork Creek On SR 1171 (Dick Jones Rd)
Description: Work includes 8,100 CY unclassified excavation; 1 ACR supplementary clearing & grubbing; 20 CY drainage ditch excavation; ; 40 ton foundation conditioning material, minor structures; 100 CY foundation conditioning geotextile; 52 LF 15" drainage pipe; 60 LF 15" RC pipe culverts, class iii; 56 lf 15" RC pipe culverts, class iv; 76 LF 18" RC pipe culverts, class iv; 48 LF 15" cs pipe culverts, 0.064" thick; 4 EA cs pipe elbows," thick (15", 0.064"); 200 ton incidental stone base; 450 TON asphalt conc base course, type b25. 0c; 340 TON asphalt conc surface course, type s9. 5b; 45 TON asphalt binder for plant mix. See attached file.