Description: The City of Cape Coral is soliciting bids for repair of the Surfside Boulevard Bridge over Maxine Canal under solicitation 2027-ITB-PW-013-KR. Work is to be completed in accordance with the specifications on file with the city's procurement office and bidders must follow the detailed specifications and submittal instructions provided there. Bids must be submitted through the city's procurement portal by 3:00 P.M. ET on December 30, 2026.
City · FL, US
Decision makers connected to this RFP from City of Cape Coral.
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
The FY2025 third-quarter update recorded FHWA- and City-funded design for repair of Bridge Structure 125724, with construction estimated for FY26 but postponed pending hydrologic and hydraulic analysis and FEMA approval.
A.) Repair of Bridge Structure 125724 (single structure) located over the Maxine Canal on Surfside Boulevard, south of Veterans Memorial Parkway: 1. Design Funded by FHWA (80%) and City of Cape Coral (20%) 2. Design Start: May 2024 1. 100% Complete pending staff and FDOT review and approval 2. Final Design pending Hydrologic and Hydraulic 3. Est. Design…
City of Cape Coral Capital Improvement Projects 2025
Capital improvement plan · 2025
A.) Repair of Bridge Structure 125724 (single structure) located over the Maxine Canal on Surfside Boulevard, south of Veterans Memorial Parkway: 1. Design Funded by FHWA (80%) and City of Cape Coral (20%) 2. Design Start: May 2024 1. 100% Complete (KCA) pending staff and FDOT review and approval 2. Final Design pending evaluation of Hydrologic and…
2025-2026
Capital improvement plan · 2025
Repair of Bridge Structure 125724 (single structure) located over the Maxine Canal on Surfside Boulevard, south of Veterans Memorial Parkway: 1. FUNDING: a) FHWA (80%) and City of Cape Coral (20%) 2. EST. DESIGN COST: a) $130,000 +/- 3. DESIGN START: a) May 2024 4. DESIGN STATUS a) 100% Complete (KCA) b) Final Design pending evaluation of Hydrologic and…
City of Cape Coral Capital Improvement Projects 2026
Capital improvement plan · 2026
Capital improvement plan
The CIP recorded that the Surfside Boulevard bridge repair was fully permitted, had completed H&H analysis, and had its CEI and construction bid packages being finalized for a Q4 FY26 start.
Repair of Bridge Structure 125724 (single structure) located over the Maxine Canal on Surfside Boulevard, south of Veterans Memorial Parkway: 1. FUNDING: a) FHWA (80%) and City of Cape Coral (20%) 2. EST CONSTRUCTION COST: a) $119,884.12 3. EST. CONSTRUCTION START: Q4 of FY26 a) Once the review process with the City and FDOT is completed, and the final…
City of Cape Coral Capital Improvement Plan 2026
Capital improvement plan · 2026
Capital improvement plan
132 days before RFP
The City of Cape Coral recorded approval of the Construction LAP Agreement for Surfside Boulevard Bridge Structure 125724, with CEI and construction bid packages advertised for an October 8, 2026 bid date and construction anticipated in Q4 of FY26.
Repair of Bridge Structure 125724 (single structure) located over the Maxine Canal on Surfside Boulevard, south of Veterans Memorial Parkway: 1. FUNDING: a) FHWA (80%) and City of Cape Coral (20%) 2. EST CONSTRUCTION COST: a) $119,884.12 3. EST. CONSTRUCTION START: Q4 of FY26 a) Once the review process with the City and FDOT is completed, and the final…
City of Cape Coral Capital Improvement Projects 2026
Capital improvement plan · Aug 10, 2026
Board meeting
132 days before RFP
Cape Coral Council approved acceptance of $353,516 in FDOT funding for construction engineering and inspection services for the Surfside Boulevard Bridge over Maxine Canal.
Council Accepts Funding for Repairs of Surfside, Sands Bridges Council approves Resolutions 161-26 and 162-26, accepting funding from the Florida Department of Transportation for construction engineering and inspection services for the Surfside Boulevard Bridge over the Maxine Canal ($353,516) and the Sands Boulevard Bridge over the Eternity Canal ($1.4M).…
Cape Coral City Council Meeting Highlights
Board meeting · Jul 15, 2026
RFP published
Proposals due (33 days left)
Adjacent opportunities open for bidding right now.
CityFL
Posted
Sep 7, 2026
Dec 30, 2026
5 Capital Projects Fund - Bridge 314 - Increase in Budget City Council approved Resolution 161-26 accepting funding from the Florida Department of Transportation for construction related costs for Surfside Boulevard over Maxine Canal - Bridge No. 125724. These grant funds will go towards bridge repairs. Amending the budget to recognize the additional funds…
City of Cape Coral FY2026 Budget Amendment
Budget amendment · Oct 1, 2025
5 Capital Projects Fund - Bridge 314 - Increase in Budget City Council approved Resolution 161-26 accepting funding from the Florida Department of Transportation for construction related costs for Surfside Boulevard over Maxine Canal - Bridge No. 125724. These grant funds will go towards bridge repairs. Amending the budget to recognize the additional funds…
City of Cape Coral FY2026 Budget Amendment (2026-11-02)
Budget amendment · Oct 1, 2025
Seeking qualified contractors to perform permanent repairs to a bridge over a canal, including installation of riprap, embankment restoration, gravity wall replacement, sidewalk replacement, and erosion control measures to address storm-related damage.
CityFL
Posted
Nov 24, 2026
Dec 30, 2026
Work inlcudes perform permanent repairs, repairs to the damaged bulkhead system, restoration of eroded embankment and backfill areas, replacement of damaged concrete slope pavement, and installation of scour protection within and adjacent to eternity canal.
CityFL
Posted
-
Dec 30, 2026
The City of Cape Coral is soliciting bids for Repair to Sands Boulevard Bridge over Eternity Canal, solicitation 2027-ITB-PW-014-KR. The required work will be performed in accordance with the specifications on file with the City. Bidders must obtain detailed specifications and submission instructions from the city's procurement portal and submit proposals electronically through the portal.
Special DistrictOR
Posted
Nov 20, 2026
Dec 16, 2026
Metro requests bids for St. Johns Landfill Bridge Repair. The St. John’s Landfill Bridge (“SJL Bridge”), located in North Landfill Rd., provides access across the Columbia Slough to the St. John’s Landfill (“SJL” or “Landfill”) and is privately owned by Metro. The Landfill is a piece of land surrounded by water on all sides. The existing bridge was constructed in 1957 and serves as a replacement for the original Incinerator Rd. Bridge which was built in 1938. Metro is assessing and repairing the bridge according to federal and state standards. The maintenance and repairs will increase the current capacity of the bridge to support a single 17-ton vehicle crossing the bridge and restore vehicular access for maintenance and operational needs for utility and landfill infrastructure.