Closing soonREPAIR AND INSTALL GUTTING STATION RFP
Description: This informal bid solicitation is being conducted pursuant to Title 31 Section 239(a)(3) of the Virgin Islands Code. The Government reserves the right to cancel this informal bid solicitation.
Service Requested: Carcass Rail Elevation Lift System- Inspection and Repair The St. Croix Abattoir is requesting a qualified contractor/technician to inspect, diagnose, and repair the Carcass Rail Elevation Lift System used during the evisceration process. The system raises and lowers the carcasses to the appropriate working height, allowing butchers to safely and efficiently complete evisceration. Current Issue: The system is not maintaining its set position during operation. While the butcher is performing evisceration, the system gradually lowers on its own instead of remaining securely at the selected working height. This presents an operational and potential safety concern. Scope of Service: Inspect and diagnose the complete Carcass Rail Elevation Lift System. Determine the cause of the system lowering on its own. Inspect electrical, mechanical, hydraulic/pneumatic components as applicable. Repair or replace worn, damaged, or malfunctioning components as necessary. Test the system to ensure it securely maintains the selected elevation without unintended downward movement. Provide recommendations for additional repairs or replacement needs. Provide a recommended preventative maintenance schedule, including routine inspections, servicing/lubrication requirements, and recommended maintenance intervals. On-site visits are welcomed and recommended to allow contractors to properly assess the existing system before submitting a bid To supply cutting station / elevating platform #100348: Air/oil system - allows uniform movement of platform that prevents jerking, bounding and creeping. Pneumatic foot controls for up/down movement. Fiber grate floor deck. Stainless steel construction with painted cylinder. Requires 90 psi and 6 cfm. Working Platform: 30" W X 42" L. Stroke Range: 54"- 102". * See attached Drawing * Removal of old cutting station and replace with a new cutting station with all the needed tools and part requirements. * The lead time from the time of order placement to freight forwarder in Miami is twelve to fourteen weeks. Once received in St. Croix, the removal of existing station and installation of the new station can be completed in five days. * 50% deposit required with purchase order. * Final payment due after installation