Jul 31, 2026
Closes
Sep 4, 2026
Request For Proposal For the Operation and Maintenance of a Ferry Service at Randall's Island Park
Operation and maintenance of a ferry service.
Description: The owner is seeking a concessionaire to renovate, operate & maintain an amusement park. Parks is seeking a concessionaire for one (1) twenty (20) year term. The concessionaire will be required to renovate, operate, and maintain an amusement center, which may include games, go-carts and other amusement attractions. The concessionaire will be required to renovate, operate and maintain a food service facility at a high standard of quality. Replace rides as needed. Provide engineering and design as may be required. Replace perimeter fencing and entrance gates, as needed. Repave and restripe entire parking lot, including striping for handicap parking spaces per Code. Renovate or replace any kiosk, building structure, snack bar and ticket booth, as needed. Renovate public restrooms as needed and make ADA compliant. Repave walkways, as needed. Provide new landscaping throughout premises. Provide new signage. Repair all concrete pavement cracks and maintain go-cart track paving. Eliminate all trip hazards. Replace HVAC units with energy-efficient and/or Energy Star compliant units. Upgrade lighting throughout to be LED and energy-efficient. Upgrade utilities (water/electricity) as may be required.
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Jul 31, 2026
Closes
Sep 4, 2026
Operation and maintenance of a ferry service.
Aug 10, 2026
Closes
Sep 4, 2026
Professional services for the renovation of the Nancy Moore park pavilion and restroom building. Required upgrades include: New aluminum drip edge, ice/water guard. Update pavilion structure: replace damaged boards, power wash and finish with stain. Install new vinyl siding and include house wrap and siding blocks for plaques, lights and plugs. Remove existing walls on the restrooms building and replace. Replace light fixtures with LED strip lights in restrooms and one LED fixture on outside gable end. Insulate ceilings in restrooms and add electric heaters for year round use. Install new circuit for heaters and new commercial grade fan motor with two ducts. Install power out to the ball fields. Install new toilets, sinks and faucets in the restrooms. Install new tile floors in the restrooms. Install ADA compliant privacy panels to both restrooms.
Special DistrictNE
Aug 18, 2026
Closes
Sep 3, 2026
To perform annual, and corrective, maintenance on power plant HVAC systems.
Aug 3, 2026
Closes
Aug 31, 2026
Work includes selective demolition of an existing restroom facility and the construction of a new restroom facility (288 SF) including a covered shelter (1,600 SF) and storage area (266 SF). The total building area including walls, restrooms, storage area, and plumbing chase is 750 SF in addition to the 1,600 SF canopy areas.