Nancy Moore Park Pavilion Renovation (Request for Proposal)
Aug 10, 2026
Closes
Sep 4, 2026
Professional services for the renovation of the Nancy Moore park pavilion and restroom building. Required upgrades include: New aluminum drip edge, ice/water guard. Update pavilion structure: replace damaged boards, power wash and finish with stain. Install new vinyl siding and include house wrap and siding blocks for plaques, lights and plugs. Remove existing walls on the restrooms building and replace. Replace light fixtures with LED strip lights in restrooms and one LED fixture on outside gable end. Insulate ceilings in restrooms and add electric heaters for year round use. Install new circuit for heaters and new commercial grade fan motor with two ducts. Install power out to the ball fields. Install new toilets, sinks and faucets in the restrooms. Install new tile floors in the restrooms. Install ADA compliant privacy panels to both restrooms.