Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The trail project is to upgrade the existing trail to a Universal Access Trail. A portion of the project is funded via a MTP grant, administered by the Bureau of Parks and Lands, Grants & Community Recreation Program. The trail must be consistent with the guidelines described in US Forest Service Outdoor Recreation Accessibility Guidelines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes exterior glass & glazing that will be part of the larger renovation of the existing building. See outside link.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2026
Release: Nov 14, 2025
Close: Dec 17, 2026
Work includes exterior glass & glazing that will be part of the larger renovation of the existing building. See outside link.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Seattle Public Works is soliciting bids to renovate a portion of the Waterfront Trail within Washington Park Arboretum, including replacement/renovation of floating and on‑grade trail segments on Foster Island, site furnishings and plantings, with two additive construction options (a gangway/bridge/platforms and an on‑grade HDPE pipe‑supported boardwalk). The engineer’s estimate for the base bid is $960,000 with Additive #1 estimated at $510,000 and Additive #2 at $1,271,445. The solicitation includes a non‑mandatory pre‑bid meeting (Teams) on January 8, 2026 and a bid opening/sealed bid process on January 28, 2026 at 2:00 PM PT.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
The City of Seattle Public Works is soliciting bids to renovate a portion of the Waterfront Trail within Washington Park Arboretum, including replacement/renovation of floating and on‑grade trail segments on Foster Island, site furnishings and plantings, with two additive construction options (a gangway/bridge/platforms and an on‑grade HDPE pipe‑supported boardwalk). The engineer’s estimate for the base bid is $960,000 with Additive #1 estimated at $510,000 and Additive #2 at $1,271,445. The solicitation includes a non‑mandatory pre‑bid meeting (Teams) on January 8, 2026 and a bid opening/sealed bid process on January 28, 2026 at 2:00 PM PT.
AvailableThe solicitation requests renovation of 1.1 miles of shared-use path and restoration of approximately 2,100 linear feet of outfall within Wheaton Regional Park. Work includes erosion and sediment control, tree removals and preservation, demolition, channel stabilization, grading, and full-depth ADA-compliant asphalt paving, plus stream/drainage structures, plantings, landscaping, and site restoration. The procurement seeks qualified contractors to submit sealed bids for construction work overseen by Montgomery County Parks.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
The solicitation requests renovation of 1.1 miles of shared-use path and restoration of approximately 2,100 linear feet of outfall within Wheaton Regional Park. Work includes erosion and sediment control, tree removals and preservation, demolition, channel stabilization, grading, and full-depth ADA-compliant asphalt paving, plus stream/drainage structures, plantings, landscaping, and site restoration. The procurement seeks qualified contractors to submit sealed bids for construction work overseen by Montgomery County Parks.
AvailableWork incldues 100 LF root pruning. Complete in place. (contingency); 1 LS demoliton. remove, recycle, properly dispose of all existing site features, including pavements, concrete, site furnishings, storm drain structures and piping, and related items, as needed for construction; 1 LF clearing and grubbing, including miscellaneous and overhead branch pruning as necessary for 12' clearance, tree removal (below 24" dbh), flush cut. complete in place; 20 EA tree felling, flush cut stump, 24"+ dbh per fcp. See attached file.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Work incldues 100 LF root pruning. Complete in place. (contingency); 1 LS demoliton. remove, recycle, properly dispose of all existing site features, including pavements, concrete, site furnishings, storm drain structures and piping, and related items, as needed for construction; 1 LF clearing and grubbing, including miscellaneous and overhead branch pruning as necessary for 12' clearance, tree removal (below 24" dbh), flush cut. complete in place; 20 EA tree felling, flush cut stump, 24"+ dbh per fcp. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →