Raleigh Durham Airport Authority
Special DistrictNC
Posted
Nov 13, 2026
Nov 30, 2026
Remove and replace 2 coils on air cooler chillers at Terminal 1 RFP
The Raleigh-Durham Airport Authority is seeking a licensed HVAC contractor to remove (2) failed coils and install (2) new condenser coils in a Trane Air Cooled Chiller. The unit is located at Terminal 1 (RDU Airport) 1600 John Brantley Boulevard. The contractor shall provide all materials, tools, equipment, and labor required for removal and replacements. Equipment shall be removed from RDUAA property and disposed of by the contractor. The work performed should adhere to local and state codes. The contractor will be responsible for any permits required such as electrical and mechanical. All work shall be performed between 7:00 AM and 4:00 PM Monday – Friday and coordinated with the Facilities Maintenance Director; Justin Cash (919-840-7809). Equipment Details Trane Air Cooled Chiller Model# CGAM130F2P02 Serial# U16E55724 Scope of Work Contractor will recover the refrigerant from the current failed coils on the circuits of the Air-Cooled Chiller. Remove the failed coil on Circuit #1 and install a new coil. Remove the failed coil on Circuit #2 and install a new coil. Pressure tests the new coils with nitrogen. Pull a vacuum and charge coils with the appropriate amount of refrigerant. Coils should be brought online through the chiller control panel and tested after installation and charge is complete.
