Closing soon

Removal and Restoration of Gypsum Board in Aguadilla PR RFP

Description: Safety & preparation: Certified technician equipped with proper PPE per OSHA regulations. Setup of containment barriers and decontamination chambers to prevent cross-contamination in unaffected areas. Air Filtration Device (Negative Air Fan / Air Scrubber) installed and operated continuously during the project for air purification. Dehumidifier installed to stabilize and control humidity throughout the remediation period. Protective plastic covering applied to isolate work zones and protect unaffected areas. Mold Remediation Procedures: HEPA vacuuming of all affected areas including floors, walls, and ceilings. Use of HEPA filters for canister or backpack vacuums to remove fine particulate contaminants. Application of antimicrobial agent to floors and all surfaces to eliminate residual microbial presence. Air cycling maintained throughout the process to remove contaminated particles from the air. All equipment setup, monitoring, and takedown performed according to IICRC and OSHA safety standards. See attached file.

Buyer
Prescott National Forest

Federal · AZ, US

Released
Oct 14, 2026
Closes
Oct 30, 2026(2 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts