Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City Water, Light and Power
The City of Springfield, Illinois Office of Public Utilities (CWLP) is soliciting bids for contract UE27-07-32, InsideWire, Highway Lighting, Traffic Systems, covering supervision, tools, equipment, and labor for construction, repair, servicing, and maintenance of traffic systems, highway lighting, and inside electrical work for the municipal utility. The scope includes ADA-compliant pedestrian systems (push buttons, audible/tactile devices, countdown displays), traffic signal electrical work including service connections, grounding, wiring, terminations, controller/cabinet installation and troubleshooting, signal timing and coordination, and communications/interconnect systems including fiber optic, copper, or wireless. Bids are due by August 6, 2026 at 2:00 PM CDT, with the last date to submit questions being July 27, 2026 at 12:00 PM.
Posted Date
Jul 14, 2026
Due Date
Aug 6, 2026
Release: Jul 14, 2026
City Water, Light and Power
Close: Aug 6, 2026
The City of Springfield, Illinois Office of Public Utilities (CWLP) is soliciting bids for contract UE27-07-32, InsideWire, Highway Lighting, Traffic Systems, covering supervision, tools, equipment, and labor for construction, repair, servicing, and maintenance of traffic systems, highway lighting, and inside electrical work for the municipal utility. The scope includes ADA-compliant pedestrian systems (push buttons, audible/tactile devices, countdown displays), traffic signal electrical work including service connections, grounding, wiring, terminations, controller/cabinet installation and troubleshooting, signal timing and coordination, and communications/interconnect systems including fiber optic, copper, or wireless. Bids are due by August 6, 2026 at 2:00 PM CDT, with the last date to submit questions being July 27, 2026 at 12:00 PM.
AvailableCity Water, Light and Power
The buyer seeks bids to furnish and deliver a range of water main resilient-seated gate valves and tapping valves for utility operations. The scope includes specified quantities of 4-inch to 12-inch gate valves and 4-inch to 12-inch tapping valves, in accordance with standard AWWA specifications. Bids are due by January 29, 2026, and the opportunity is open as of January 15, 2026.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
City Water, Light and Power
Close: Jan 29, 2026
The buyer seeks bids to furnish and deliver a range of water main resilient-seated gate valves and tapping valves for utility operations. The scope includes specified quantities of 4-inch to 12-inch gate valves and 4-inch to 12-inch tapping valves, in accordance with standard AWWA specifications. Bids are due by January 29, 2026, and the opportunity is open as of January 15, 2026.
City Water, Light and Power
City of Springfield is seeking a Director of Planning & Markets for its Office of Public Utilities Electric Division.
Posted Date
-
Due Date
Jan 10, 2026
Release: -
City Water, Light and Power
Close: Jan 10, 2026
City of Springfield is seeking a Director of Planning & Markets for its Office of Public Utilities Electric Division.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City Water, Light and Power
This document outlines the Lead Service Line Replacement Plan for the City of Springfield, Illinois City Water, Light & Power. The plan aims to replace 9,201 lead service lines over a 21-year period. Key priorities include proactive and emergency replacements of both utility-owned and customer-owned lead or galvanized service lines, focusing on high-risk facilities and areas with low median household incomes, and coordinating with other public works projects. The objective is to minimize consumer exposure to lead in drinking water and ensure compliance with the Lead Service Line Replacement and Notification Act, HB3739.
The meeting included the presentation of reports from the Inspector General concerning various allegations. Topics covered included a claim of conspiracy against a city resident, issues regarding compensatory time for salaried employees, allegations about mayoral appointments, issues with temporary assignments, and the termination of a probationary meter reader. Zoning matters were also discussed, specifically the reclassification of properties from R1 to B2 classification, including conditions and exclusions for permitted uses. Additionally, variances were requested and approved for setbacks, accessory structures, and the operation of a gunsmith shop and a tavern/video gaming parlor.
The public forum focused on generation unit retirements, particularly a closer look at unit 33. Key discussion points included the recent failure of unit 33, demolition costs, natural gas forward curves, and the need to replace units 31, 32, and 33. The council also addressed converting unit 33 to natural gas and converting Dolman unit three to dry ash, as well as environmental considerations and financial steps.
The meeting discussed the integrated resource plan, touching on long-term load forecasts, unit cost information, and various scenarios. Key points included the economic analysis of generating units, the impact of renewable energy growth, market prices, and environmental regulations. Recommendations were made regarding the retirement of certain units, the expansion of energy efficiency programs, and the consideration of renewable energy sources.
The FY2025 budget presentation for City Water, Light & Power covers various aspects of the Electric and Water Funds. For the Electric Fund, key discussion points include strengths such as local control and financial condition, challenges like regional grid reliability and aging infrastructure, and projects related to transmission and distribution, substation upgrades, and rail consolidation. The Water Fund discussions involve addressing structural cash deficits, investing in infrastructure, managing lead service line replacements, and allocating funds for water main replacements, chemical and pump funding, and watershed work. Rate increase allocations for both FY25 and FY26 are also detailed, along with comparisons of residential electric and water rates with other utilities.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City Water, Light and Power's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge