CityOK
Posted
Aug 25, 2026
Sep 25, 2026
Arterial Street Rehabilitation S. Cheyenne Ave. - E. 13th St. To E. 1st St.
Arterial street rehabilitation.
Description: The City of Peoria is seeking proposals for rehabilitation of the property at 525 E Melbourne Ave. The solicitation was published on September 10, 2026, and proposals are due September 30, 2026, at 2:00 PM CDT. This is an open property-rehabilitation solicitation rather than a grant program.
City · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Peoria.
Adjacent opportunities open for bidding right now.
CityOK
Posted
Aug 25, 2026
Sep 25, 2026
Arterial street rehabilitation.
CityCA
Posted
-
Sep 17, 2026
Cold mill 2" thick existing ac pavement; repair damaged areas, patch and crack seal; apply tack coat. Cold mill 2.5" thick existing ac pavement; repair damaged areas, patch and crack seal; apply tack coat. Construct uniform 1. 5" thick arhm (type GG-C) surface course construct uniform asphalt concrete (type c2-pg 64-10) levelling course localized ac pavement repair at the engineer's direction during construction: remove ac pavement section to a depth of 10" and reconstruct it with 4" ac pavement section consisting of 1. 50" arhm wearing course (arhm type GG-C) and 2. 50" ac leveling course (type b-pg 64-10) with 6" crushed aggregate base and prior to construction of ac pavement section, scarify and recompact the exposed base/subgrade. (location and area to be determined on the field). Remove and reinstall type d and type e traffic loops as shown on the plan; connect wires to existing lead-in cables per caltrans std plans es-5a and es-5b and specifications. Adjust water valve slip can to grade. It shall be the contractor responsibility to notify and coordinate the work with the water purveyor and to picked up the replacement slip cans from the said purveyor. Verify actual number and location on the field during construction. Adjust utility storm drain and/or sewer manhole frame and cover to grade. Remove raised pavement markers and conflicting striping. Install street pavement marking and striping. Provide & maintain portable changeable message signs.
CityMO
Posted
Aug 4, 2026
Oct 28, 2026
Project shall be defined as providing supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to sandblast, make necessary repairs and install the new coating system.
CountyFL
Posted
Aug 3, 2026
Sep 29, 2026
Intersection Improvements (Segment 3), to include intersection improvements, roadway design, drainage, and signalization with lighting. 3,034 LF conduit, furnish & install, directional bore.