CityFL
Jul 26, 2026
Closes
Aug 13, 2026
Air Traffic Control Tower Rehabilitation
Work includes rehabilitation of the deteriorated condition of the tower's exterior catwalk and associated infrastructure presents both safety and operational concerns.
Description: The City of Deerfield Beach is soliciting sealed electronic bids for the rehabilitation and restoration of the 3-MGD RO Plant Degasifier Tower and Odor Control Scrubber System at its Water Treatment Plant. The work includes removal and disposal of existing media, cleaning and inspection, structural grating and minor repairs, interior coating, installation of owner-supplied media, and performance testing. Bidders must hold a valid Florida Certified or Registered General Contractor license, submit a five-percent bid guaranty, and may attend the non-mandatory pre-bid conference on August 5, 2026.
City · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Deerfield Beach.
Adjacent opportunities open for bidding right now.
CityFL
Jul 26, 2026
Closes
Aug 13, 2026
Work includes rehabilitation of the deteriorated condition of the tower's exterior catwalk and associated infrastructure presents both safety and operational concerns.
CountyFL
Jul 27, 2026
Closes
Aug 14, 2026
The County of Flagler is soliciting sealed bids for rehabilitation of the Air Traffic Control Tower and supporting infrastructure at Flagler Executive Airport. The work includes building-envelope and structural repairs, tower-cab improvements, roof-hatch and HVAC replacement, interior painting, and access-control upgrades, with additional work subject to funding availability. A Design Criteria Package provides the solicitation’s directives and specifications, and bids are due August 14, 2026 at 10:00 a.m. Eastern Time.
Oct 8, 2025
Closes
Aug 5, 2026
Provide water pollution control plant, secondary clarifiers rehabilitation. Separate the activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities.
Jul 20, 2026
Closes
Aug 5, 2026
RO Membranes for Hargis-Hebert Plant.