CityFL
Jul 26, 2026
Closes
Aug 13, 2026
Air Traffic Control Tower Rehabilitation
Work includes rehabilitation of the deteriorated condition of the tower's exterior catwalk and associated infrastructure presents both safety and operational concerns.
Description: The County of Flagler is soliciting sealed bids for rehabilitation of the Air Traffic Control Tower and supporting infrastructure at Flagler Executive Airport. The work includes building-envelope and structural repairs, tower-cab improvements, roof-hatch and HVAC replacement, interior painting, and access-control upgrades, with additional work subject to funding availability. A Design Criteria Package provides the solicitation’s directives and specifications, and bids are due August 14, 2026 at 10:00 a.m. Eastern Time.
County · FL, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Flagler County.
Adjacent opportunities open for bidding right now.
CityFL
Jul 26, 2026
Closes
Aug 13, 2026
Work includes rehabilitation of the deteriorated condition of the tower's exterior catwalk and associated infrastructure presents both safety and operational concerns.
Special DistrictFL
Mar 8, 2026
Closes
Aug 3, 2026
The project generally consists of architectural, structural, mechanical, and electrical improvements to the Air Traffic Control Tower (ATCT), including replacement of groundlevel ventilation louvers and HVAC upgrades; exterior waterproofing, repairs, cleaning, and painting of tower walls and cab metal panels; installation of a permanent roof over the ground-level electrical room; replacement of the cab roofing, glazing system, hurricane shutters, window seals, ground-level exterior doors, and associated components; corrosion repair and recoating of catwalk handrails; inspection and minor maintenance of fire protection systems; replacement of the fire alarm and lightning protection systems; and installation of new conduit supports at the cab roof. Bid alternates include repair of exterior stucco on concrete tie beams and columns..
Feb 20, 2026
Closes
Aug 17, 2026
The scope of work for this Design-Bid-Build project is to construct a 10-story Air Traffic Control Tower consisting of control CAB, offices, conference room, breakroom, electrical and mechanical rooms, radar simulator room and associated utility and site work. The project includes, but is not limited to, construction of concrete foundation systems, steel framing, masonry walls, metal roof, fire detection and suppression systems, HVAC, electrical systems, telecommunication systems, backup electrical generation, elevator, utilities, sidewalks, access drive, grading and site improvements, and other required features of work. Demolition of the existing Air Traffic Control Tower and associated structures is also required.
StateOK
Jun 26, 2026
Closes
Aug 5, 2026
Construct New Air Traffic Control Tower is a public solicitation to construct a new air traffic control tower in Oklahoma. The solicitation was published on 2026-06-26 and proposals are due 2026-08-05 at 10:00 AM CDT (08/05/2026 15:00:00Z). Bid documents and buyer contact information are not publicly available on the posting and require registration on the buyer portal to access full documentation.