Summary
The project generally consists of architectural, structural, mechanical, and electrical improvements to the Air Traffic Control Tower (ATCT), including replacement of groundlevel ventilation louvers and HVAC upgrades; exterior waterproofing, repairs, cleaning, and painting of tower walls and cab metal panels; installation of a permanent roof over the ground-level electrical room; replacement of the cab roofing, glazing system, hurricane shutters, window seals, ground-level exterior doors, and associated components; corrosion repair and recoating of catwalk handrails; inspection and minor maintenance of fire protection systems; replacement of the fire alarm and lightning protection systems; and installation of new conduit supports at the cab roof. Bid alternates include repair of exterior stucco on concrete tie beams and columns..