Olivehurst Roadway Climate Resiliency Project
Work includes 8 EA sidewalk barricade; 69 CY structure excavation (headwall); 42 CY structure backfill (headwall); 15,000 CY imported borrow; 16,700 CY roadway excavation; 22,500 ton aggregate base, class 2, 3/4" gradation; 45,200 SY cold plane asphalt concrete pavement; 9,650 ton hot mix asphalt, 1/2" gradation; 4,560 SY place hot mix asphalt, 1/2 gradation (miscellaneous area); 160 LF place asphalt concrete dike; 29,500 SY remove asphalt concrete pavement; 54 CY structural concrete, headwall; 45 CY minor concrete (minor structure); 1 EA drain inlets (2'x2'); 6,500 LB bar reinforcing Steel (Headwall); 10,500 LF 8" storm drain pipe - PVC; 2,250 LF 12" storm drain pipe - HDPE; 10 LF 36" reinforced concrete pipe (Class III). See attached file.