Open RFP

Olivehurst Roadway Climate Resiliency Project

Description: Work includes 8 EA sidewalk barricade; 69 CY structure excavation (headwall); 42 CY structure backfill (headwall); 15,000 CY imported borrow; 16,700 CY roadway excavation; 22,500 ton aggregate base, class 2, 3/4" gradation; 45,200 SY cold plane asphalt concrete pavement; 9,650 ton hot mix asphalt, 1/2" gradation; 4,560 SY place hot mix asphalt, 1/2 gradation (miscellaneous area); 160 LF place asphalt concrete dike; 29,500 SY remove asphalt concrete pavement; 54 CY structural concrete, headwall; 45 CY minor concrete (minor structure); 1 EA drain inlets (2'x2'); 6,500 LB bar reinforcing Steel (Headwall); 10,500 LF 8" storm drain pipe - PVC; 2,250 LF 12" storm drain pipe - HDPE; 10 LF 36" reinforced concrete pipe (Class III). See attached file.

Buyer
County of Yuba

County · CA, US

Released
Aug 26, 2026
Closes
Oct 8, 2026(38 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts