CountyCA
Aug 3, 2026
Closes
Aug 26, 2026
Road Reconstruction on Zerker Road Bridge Abutment RFP
Work consists of 210 CY roadway excavation; 500 EA riverbed excavation; 120 CY slurry cement backfill (2-sack cement); 1 LS finishing roadway; 40 CY class 2 aggregate base; 43 TN hot mix asphalt (type a); 330 CY rock slope protection; 60 LF relocate fence; 70 LF midwest guardrail system; 70 LF reconstruct guardrail; 22 LF paint traffic stripe (2-coat).