Emergency Road and Bridge Repair RFP
Jul 29, 2026
Closes
Aug 27, 2026
Work consists of clearing and grubbing, removal of old bridge, construction of a precast concrete bridge with 1 @ 31', 1 @ 40' and 1 @ 31' precast concrete spans at 28.0" clear roadway, grading and drainage, erosion control, limestone base and hot mix asphalt base and surface.
