Closing soon

Recreation Complex Storage Building, Project #R27-03 *Re-bid* RFP

Description: Work generally includes construction of non-conditioned dry material storage building on the previously completed Phase I concrete foundation and floor slab. Scope includes CMU veneer walls and piers; masonry reinforcement, dowels, sealant, caps, and water-repellent treatment; roof trusses, wood framing, fascia, cedar soffits, and standing-seam metal roofing; gutters and downspouts; insulated steel overhead doors; insulated hollow-metal personnel door and frame with hardware; steel bollards; structural steel at the required opening; and all related accessories and work required for a complete installation. The Phase I footings and slab are existing and are not included in the base-bid construction scope except as necessary for connections to the existing work.

Buyer
Released
Aug 25, 2026
Closes
Nov 6, 2026(8 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts