Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include deactivation and stabilization of a population of approx. 200 55-gallon drums of fines consisting of comingled lithium, beryllium-contaminated, painted stainless, and depleted uranium chips and turnings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailablePremium
Access the largest public sector contact database
Work includes beach restoration and stabilization of approximately 650 linear feet of the northern portion. Placement of up to 7,700 cubic yards of clean, beach-quality sand, construction of three new rock headland breakwater structures comprised of geotextile fabrics and approximately 1,200 tons of armor stone, installation of approximately 1,118 square yards of sod, and 250 linear feet of sand fencing for shoreline stabilization and dune establishment. All work will be coordinated with the separate drainage improvement project. 7,700 cyip beach fill; 642 sy geotextile fabrics; 1,200 tn rock breakwater construction; 250 lf sand fencing; 1,118 sy vegetative planting (sod). See outside link.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work includes beach restoration and stabilization of approximately 650 linear feet of the northern portion. Placement of up to 7,700 cubic yards of clean, beach-quality sand, construction of three new rock headland breakwater structures comprised of geotextile fabrics and approximately 1,200 tons of armor stone, installation of approximately 1,118 square yards of sod, and 250 linear feet of sand fencing for shoreline stabilization and dune establishment. All work will be coordinated with the separate drainage improvement project. 7,700 cyip beach fill; 642 sy geotextile fabrics; 1,200 tn rock breakwater construction; 250 lf sand fencing; 1,118 sy vegetative planting (sod). See outside link.
AvailableWork includes beach restoration and stabilization of approximately 650 linear feet of the northern portion. Placement of up to 7,700 cubic yards of clean, beach-quality sand, construction of three new rock headland breakwater structures comprised of geotextile fabrics and approximately 1,200 tons of armor stone, installation of approximately 1,118 square yards of sod, and 250 linear feet of sand fencing for shoreline stabilization and dune establishment. All work will be coordinated with the separate drainage improvement project. 7,700 cyip beach fill; 642 sy geotextile fabrics; 1,200 tn rock breakwater construction; 250 lf sand fencing; 1,118 sy vegetative planting (sod). See outside link.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work includes beach restoration and stabilization of approximately 650 linear feet of the northern portion. Placement of up to 7,700 cubic yards of clean, beach-quality sand, construction of three new rock headland breakwater structures comprised of geotextile fabrics and approximately 1,200 tons of armor stone, installation of approximately 1,118 square yards of sod, and 250 linear feet of sand fencing for shoreline stabilization and dune establishment. All work will be coordinated with the separate drainage improvement project. 7,700 cyip beach fill; 642 sy geotextile fabrics; 1,200 tn rock breakwater construction; 250 lf sand fencing; 1,118 sy vegetative planting (sod). See outside link.
AvailableGolf stream stabilization and associated items of work.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Golf stream stabilization and associated items of work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis