Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Invitation for Bid is for the repair and stabilization of approximately 80 linear feet of eroding streambank on Cartoogechaye Creek within the Parker Meadows Recreation Complex.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes street stabilization.
Posted Date
Jan 15, 2026
Due Date
Feb 9, 2026
Release: Jan 15, 2026
Close: Feb 9, 2026
Work includes street stabilization.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
Posted Date
Jul 12, 2025
Due Date
Feb 4, 2026
Release: Jul 12, 2025
Close: Feb 4, 2026
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
AvailableThe project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
Posted Date
Dec 31, 2025
Due Date
Feb 17, 2026
Release: Dec 31, 2025
Close: Feb 17, 2026
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
AvailableWork tasks will generally involve site access and staging; installation and removal of temporary erosion and sediment controls; excavation and grading to construct floodplain benches along an unnamed tributary to keeler bay (generally up to 25 feet wide) to improve floodplain access; instream excavation and shaping; installation of approximately four stone grade control structures to stabilize existing headcuts and tie into existing stream grade; backfilling and stabilization of eroding headcut areas with stone; protection of existing underground utilities including a septic force main; hauling, placement, and grading of excavated materials; stream channel stabilization and restoration; site stabilization including seeding, mulching, erosion control matting, and final grading; and restoration of pre-construction or improved conditions of all disturbed areas (see attachment a). Instream structures and grading may require field adjustments at the time of construction to reflect existing conditions.
Posted Date
Jan 26, 2026
Due Date
Feb 26, 2026
Release: Jan 26, 2026
Close: Feb 26, 2026
Work tasks will generally involve site access and staging; installation and removal of temporary erosion and sediment controls; excavation and grading to construct floodplain benches along an unnamed tributary to keeler bay (generally up to 25 feet wide) to improve floodplain access; instream excavation and shaping; installation of approximately four stone grade control structures to stabilize existing headcuts and tie into existing stream grade; backfilling and stabilization of eroding headcut areas with stone; protection of existing underground utilities including a septic force main; hauling, placement, and grading of excavated materials; stream channel stabilization and restoration; site stabilization including seeding, mulching, erosion control matting, and final grading; and restoration of pre-construction or improved conditions of all disturbed areas (see attachment a). Instream structures and grading may require field adjustments at the time of construction to reflect existing conditions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →