Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: 1 ammonia feed system - add new aqua ammonia chemical feed system with injection into the finished water main after the high service pumps; one (1) aqua ammonia storage totes, new chemical metering pump skid, and associated chemical piping and valves housed in a new fiberglass reinforced plastic building on a concrete pad; 2 sedimentation basin sludge removal system - add new traveling suction type sludge removal system to each of the existing two (2) sedimentation basins, sludge will discharge via automated valves to discharge box and to backwah holding/sludge thickener tank; 3 replacement of the flash mix motor and flocculation mix motors with new motors on the existing units; 4 replace existing buried decant valves at backwash holding /sludge thickener tank as shown on drawings, install new ultrasonic level probe in the existing tank for liquid level measurement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
AvailableProject consists water treatment facility upgrade. See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 1, 2026
Release: Dec 3, 2025
Close: Jan 1, 2026
Project consists water treatment facility upgrade. See outside link.
AvailableUpgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailableThe construction of a water supply well at the station water treatment facility.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The construction of a water supply well at the station water treatment facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis