Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Crestone
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Westerly
Nitrogen Reduction Upgrades Wastewater Treatment Facility
Posted Date
Dec 1, 2025
Due Date
Feb 18, 2026
Release: Dec 1, 2025
Town of Westerly
Close: Feb 18, 2026
Nitrogen Reduction Upgrades Wastewater Treatment Facility
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sandy
Demolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
Posted Date
Nov 17, 2025
Due Date
Jan 15, 2026
Release: Nov 17, 2025
City of Sandy
Close: Jan 15, 2026
Demolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
AvailableCity of Miami Beach
Storm Water Pump Station 24 Water Quality Upgrades.
Posted Date
Oct 21, 2025
Due Date
Dec 5, 2025
Release: Oct 21, 2025
City of Miami Beach
Close: Dec 5, 2025
Storm Water Pump Station 24 Water Quality Upgrades.
AvailableStafford County
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
Posted Date
Nov 7, 2025
Due Date
Jan 14, 2026
Release: Nov 7, 2025
Stafford County
Close: Jan 14, 2026
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →