Summary
Work includes electrical upgrades for advanced wastewater treatment facility includes demolition of existing equipment and temporary power as necessary to keep facilities running; site work; remodeling, weatherizing and adding climate control to existing building to accommodate new electrical equipment; new utility and conventional electrical ductbanks; new utility transformer on raised platform, contractor responsible for cost of relocation of transformer; new generator and enclosure; fuel transfer system; major electrical equipment to include automatic transfer system, main switchgear and motor control centers, variable frequency drives; new SCADA node and network equipment.