Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists water treatment facility upgrade. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailablePremium
Access the largest public sector contact database
The Wyoming Department of Transportation (WYDOT) is seeking bids for the upgrade of the water treatment system at the Sherman Summit Rest Area in Albany County, Wyoming. This project involves replacing the existing sodium hypochlorite disinfection system with a new water softening and UV disinfection system, along with reconfiguring associated plumbing and equipment. Bids for Solicitation ID: 26-057NG are due electronically by January 8, 2026, at 11:00 A.M. Mountain Time, with a mandatory pre-bid meeting scheduled for December 18, 2025.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
The Wyoming Department of Transportation (WYDOT) is seeking bids for the upgrade of the water treatment system at the Sherman Summit Rest Area in Albany County, Wyoming. This project involves replacing the existing sodium hypochlorite disinfection system with a new water softening and UV disinfection system, along with reconfiguring associated plumbing and equipment. Bids for Solicitation ID: 26-057NG are due electronically by January 8, 2026, at 11:00 A.M. Mountain Time, with a mandatory pre-bid meeting scheduled for December 18, 2025.
AvailableSealed bid solicitation for full-site construction and demolition to upgrade the Bartlett Bay Wastewater Treatment Facility in South Burlington, VT. Scope includes new headworks, splitter box, secondary clarifier, replacement/refurbishment of clarifiers and aeration systems (diffusers, blowers, pumps, controls), filter replacement, chemical storage/feed building, precast post-tensioned solids handling tanks, UV building and controls, effluent heat/plant water building, main electrical service and room, new operations/maintenance building, sitework (culvert, stormwater, hardscapes), perimeter security fencing, and demolition of existing structures. Procurement is public bid via QuestCDN; procurement requirements include a 5% bid security, 100% performance and payment bonds, federal/state funding conditions (CWSRF) with Davis‑Bacon prevailing wages, DBE goals/compliance, American Iron & Steel and Build America Buy America (BABAA) requirements, and prohibition on certain telecom/video surveillance equipment.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
Sealed bid solicitation for full-site construction and demolition to upgrade the Bartlett Bay Wastewater Treatment Facility in South Burlington, VT. Scope includes new headworks, splitter box, secondary clarifier, replacement/refurbishment of clarifiers and aeration systems (diffusers, blowers, pumps, controls), filter replacement, chemical storage/feed building, precast post-tensioned solids handling tanks, UV building and controls, effluent heat/plant water building, main electrical service and room, new operations/maintenance building, sitework (culvert, stormwater, hardscapes), perimeter security fencing, and demolition of existing structures. Procurement is public bid via QuestCDN; procurement requirements include a 5% bid security, 100% performance and payment bonds, federal/state funding conditions (CWSRF) with Davis‑Bacon prevailing wages, DBE goals/compliance, American Iron & Steel and Build America Buy America (BABAA) requirements, and prohibition on certain telecom/video surveillance equipment.
AvailableTurnkey construction and installation of the Cherry Hill municipal water treatment facility — furnish all supervision, labor, materials, equipment, tools, services, installation and construction per the project manual and attachments under a firm-fixed-price IFB; bidders must provide required IFB forms and Virginia SCC registration/authority documentation.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Turnkey construction and installation of the Cherry Hill municipal water treatment facility — furnish all supervision, labor, materials, equipment, tools, services, installation and construction per the project manual and attachments under a firm-fixed-price IFB; bidders must provide required IFB forms and Virginia SCC registration/authority documentation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis