FALLSTON PARK - PHASE II RFP
The FALLSTON PARK - PHASE II project includes the installation/construction of concrete paving, picnic shelter, utility work, and landscaping.
Description: Construction of approximately 2,130 linear feet of concrete bike/pedestrian trail and tie-ins to existing driveway and sidewalk.
City · AR, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityNC
Posted
-
Sep 23, 2026
The FALLSTON PARK - PHASE II project includes the installation/construction of concrete paving, picnic shelter, utility work, and landscaping.
CityMO
Posted
Sep 2, 2026
Oct 1, 2026
The City of Neosho is soliciting bids for Phase 4 of the Morse Park Trail Lighting project, extending lighting from E. Spring Street to the Lampo Building. The project is part of a multi-year effort to replace existing solar lighting with a more cost-efficient and reliable electrical system. The solicitation is open, was published on September 2, 2026, and closes October 1, 2026, at 2:00 PM local time.
CountyMD
Posted
Sep 9, 2026
Oct 29, 2026
Work includes approx 483 LF 12" DIP watermain; 1 LS temporary sediment control; 290 SY mill and overlay; 100 CY excavation.
CityNC
Posted
Sep 16, 2026
Oct 1, 2026
The Project consists of installing a new ADA compliant handicap ramp with retaining walls and railing, retaining wall seating at the museum plaza, town clock, paver placement at the intersection, parking lot improvements to include paving, striping and wheel stops, and flagpole planter improvements. Optional items that may be included (dependent upon bid cost) are concrete removal and replacement along the parking lot, drainage installation, restriping of the existing pavement markings on additional sidewalk and curb and gutter installation.