Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The intent of the project is to improve the health of the pond by making the pond smaller and deeper and improving the habitat in and around the pond to attract both wildlife and people.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
May Creek Cemetery Pond Project includes but is not limited to wetland restoration through removal of historic fill and planting more than three acres of newly established wetland and buffer. Temporary stream diversion and dewatering are anticipated. Site furnished with public access amenities and habitat features.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
May Creek Cemetery Pond Project includes but is not limited to wetland restoration through removal of historic fill and planting more than three acres of newly established wetland and buffer. Temporary stream diversion and dewatering are anticipated. Site furnished with public access amenities and habitat features.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
AvailableThis is an Invitation for Bid from the Lancaster County Convention Center Authority for the Supplee Farm Restoration Project seeking contractors to perform stream/land restoration and associated construction work. The procurement requires online bid submission via the PennBid/Bonfire portal, includes a mandatory pre-bid site showing on January 20, 2026, and sets a questions deadline of January 29, 2026. Bids are due February 7, 2026 with bid opening scheduled February 9, 2026 and award anticipated March 10, 2026.
Posted Date
Jan 5, 2026
Due Date
Feb 7, 2026
Release: Jan 5, 2026
Close: Feb 7, 2026
This is an Invitation for Bid from the Lancaster County Convention Center Authority for the Supplee Farm Restoration Project seeking contractors to perform stream/land restoration and associated construction work. The procurement requires online bid submission via the PennBid/Bonfire portal, includes a mandatory pre-bid site showing on January 20, 2026, and sets a questions deadline of January 29, 2026. Bids are due February 7, 2026 with bid opening scheduled February 9, 2026 and award anticipated March 10, 2026.
AvailableQuincy Transmission Expansion Plan (QTEP) - West Quincy Transmission Lines.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Quincy Transmission Expansion Plan (QTEP) - West Quincy Transmission Lines.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →