Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
May Creek Cemetery Pond Project includes but is not limited to wetland restoration through removal of historic fill and planting more than three acres of newly established wetland and buffer. Temporary stream diversion and dewatering are anticipated. Site furnished with public access amenities and habitat features.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
AvailableThe Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Flume creek culvert replacement and channel restoration.
Posted Date
Jan 2, 2026
Due Date
Jan 30, 2026
Release: Jan 2, 2026
Close: Jan 30, 2026
Flume creek culvert replacement and channel restoration.
AvailableDry Creek Restoration Project. Phase 1: Meadowland, Holmes, and Henderson Ditches Project.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Dry Creek Restoration Project. Phase 1: Meadowland, Holmes, and Henderson Ditches Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis