Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Capitol Region Watershed District
Site removals, site grading, storm sewer and underground chambers, synthetic grass surfacing subgrade, pumphouse building, sanitary sewer and water service, bituminous trail and roadway patch, concrete curb and pavement, erosion control, irrigation system, pump station, site amenities installation, bituminous parking lot (bid alternative 1) restroom building and plaza (bid alternative 2) field lighting (bid alternative 3) sod turf (bid alternative 4).
Posted Date
Jun 2, 2026
Due Date
Jun 24, 2026
Release: Jun 2, 2026
Capitol Region Watershed District
Close: Jun 24, 2026
Site removals, site grading, storm sewer and underground chambers, synthetic grass surfacing subgrade, pumphouse building, sanitary sewer and water service, bituminous trail and roadway patch, concrete curb and pavement, erosion control, irrigation system, pump station, site amenities installation, bituminous parking lot (bid alternative 1) restroom building and plaza (bid alternative 2) field lighting (bid alternative 3) sod turf (bid alternative 4).
AvailableCapitol Region Watershed District
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Capitol Region Watershed District
Close: Jan 15, 2026
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Capitol Region Watershed District
Twin Cities based artists for its Watershed Artist in Residence (AiR) program. This two-year position with an option to renew includes opportunities to help shape Owner’s past, present, and future projects and programs by providing artistic/creative perspectives as part of an interdisciplinary team and facilitating Art + Water community workshops at CRWD’s Watershed Learning Center in collaboration with other local artists.
Posted Date
Sep 9, 2024
Due Date
Oct 18, 2024
Release: Sep 9, 2024
Capitol Region Watershed District
Close: Oct 18, 2024
Twin Cities based artists for its Watershed Artist in Residence (AiR) program. This two-year position with an option to renew includes opportunities to help shape Owner’s past, present, and future projects and programs by providing artistic/creative perspectives as part of an interdisciplinary team and facilitating Art + Water community workshops at CRWD’s Watershed Learning Center in collaboration with other local artists.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Capitol Region Watershed District
The committee discussed local developments including the Ford Area C site clean-up and a national opinion piece regarding stormwater management regulations. Updates were provided on the Permitted Sites Maintenance Program and progress regarding private property inspections. Staff presented the 2025 Lakes Report and information on the upcoming We Are Water Exhibit. The committee also discussed the nomination of new co-chairs, a restructuring of subcommittees to include new technical and technology focuses, and volunteer opportunities for the upcoming Annual Recognition and Watershed Steward Awards Ceremony.
The board meeting and workshop focused on updates regarding the McMurray Field and Stormwater Improvement Project, specifically covering engineering progress, project components, and potential plumbing code issues affecting stormwater reuse. Permitting actions were taken for various local infrastructure projects including sidewalk improvements, street reconstruction, park facility upgrades, and utility conduit installations. Additionally, the board discussed a draft Chloride Pollution Prevention Plan, approved a cooperative maintenance agreement with the Minnesota Department of Transportation for rain gardens, and addressed legislative resolution planning for the upcoming year.
The Board discussed the 2025 stormwater monitoring report, reviewing pollutant data and environmental trends. The Trout Brook Storm Sewer Interceptor Inspection Report and the 10-year Capital Improvement Plan were presented and accepted, with plans to begin saving funds for necessary infrastructure repairs. The Board authorized a construction contract for Como Lake access path improvements and approved a Clean Water Project grant for the Unity Unitarian Church rain garden. Updates were provided on the Como Lake aquatic plant management strategy, including plans for upcoming herbicide applications, and the Sidewalk Poetry program collaboration with Public Art Saint Paul. Additionally, the Board reviewed preparations for transitioning to hybrid meeting technology.
The Board discussed and approved several permit applications, including shoreline access path restoration, electric transmission line duct installation, and natural gas pipeline installation. The Board authorized a two-year contribution to the Minnesota Stormwater Research Council and selected Barr Engineering as the consultant for the Gottfried's Pit Flood Mitigation Feasibility Study. Additionally, staff provided updates on the upcoming We Are Water exhibit and staffing changes within the organization.
The board approved permit applications, including the reconstruction of Jackson Street to improve pedestrian mobility and stormwater systems. Financial actions included the approval of accounts payable and receivable, as well as the adoption of liability coverage through the League of Minnesota Cities Insurance Trust without waiving statutory tort limits. The board also approved the scope of work and budget for a feasibility study regarding the Kmart site redevelopment, specifically focusing on flood reduction and wetland restoration. Additionally, the board received updates on various organizational achievements, upcoming events, and conducted a performance review of the District Administrator.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Capitol Region Watershed District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge