CityIL
Jul 30, 2026
Closes
Aug 13, 2026
Distribution System Line Clearance Services RFP
Distribution system line clearance services - trimming.
Description: Snohomish County PUD is seeking a contractor for transmission and distribution line clearance services under solicitation 26-1696-KP. The work includes pruning, cutting, treating, clearing, and disposing of trees and brush, reseeding, and related services along approximately 36 pole miles of the District’s transmission and distribution system. The contractor must provide all labor, materials, and equipment, comply with applicable safety and environmental requirements, and submit a project completion plan and invoices based on percentage of work completed.
SpecialDistrict · WA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityIL
Jul 30, 2026
Closes
Aug 13, 2026
Distribution system line clearance services - trimming.
West Boylston Municipal Light Plant
Special DistrictMA
Jul 6, 2026
Closes
Aug 6, 2026
Tree Trimming/ Line Clearance.
Special DistrictSD
Jul 16, 2026
Closes
Aug 13, 2026
The material required is as follows: Self-Supporting Steel Poles, Laminated Wood Poles, Ductile Iron Poles, 115 kV Braced Line Post Insulator Assemblies, Suspension Insulator Assemblies, Optical Ground Wire (OPGW), ACSS Cable, and Miscellaneous ACSS Hardware.
CountyAL
Jul 12, 2026
Closes
Aug 6, 2026
Project consist of potable water control valve station: reinforced concrete vaults vault piping and valves - large diameter ductile iron (12" through 24"); yard piping and valves - large diameter ductile iron (16" through 36"); electrical system; sitework; miscellaneous appurtenances and work.
Procurement and program contacts connected to Snohomish County Public Utility District 1.