Special DistrictCA
Posted
Aug 27, 2026
Oct 8, 2026
Gantry Crane Replacement Project
Work includes removal of the existing gantry crane system and the furnishing and installation of a complete new 5-ton motorized gantry crane system work includes, but is not limited to, demolition and disposal of the existing gantry crane system, installation of new rails, bridge, trolley, hoist, controls, power feed system, electrical modifications, temporary lifting capability during the crane outage, operational testing, certified load testing, commissioning, operator training, warranties, and all associated closeout documentation, as required by the contract documents