Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: New zone 2 booster pumps (four), piping and valves, electrical motor control centers and adjustable speed drives, instrumentation and control equipment, surge control tank, air compressor and controls, and standby engine generator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Procurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
AvailableWork consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
Posted Date
Sep 2, 2025
Due Date
Mar 6, 2026
Release: Sep 2, 2025
Close: Mar 6, 2026
Work consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
AvailableWork includes installation of new prepackaged water pump station, concrete pad, electrical installations, connection to existing water lines.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Close: Feb 10, 2026
Work includes installation of new prepackaged water pump station, concrete pad, electrical installations, connection to existing water lines.