Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of new prepackaged water pump station, concrete pad, electrical installations, connection to existing water lines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Coastal Water Authority is soliciting qualifications for Construction Administration, Inspection Services, and Construction Materials Testing for the Lynchburg Pump Station B System Improvements in Harris County, TX. The work includes administration of the construction contract (submittals, RFIs, change orders), schedule and payment verification, site inspections, and materials testing for steel, piping, paints/coatings, and other items. A pre-proposal Teams meeting is scheduled for 2026-01-21 and proposals are due on 2026-01-30.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Coastal Water Authority is soliciting qualifications for Construction Administration, Inspection Services, and Construction Materials Testing for the Lynchburg Pump Station B System Improvements in Harris County, TX. The work includes administration of the construction contract (submittals, RFIs, change orders), schedule and payment verification, site inspections, and materials testing for steel, piping, paints/coatings, and other items. A pre-proposal Teams meeting is scheduled for 2026-01-21 and proposals are due on 2026-01-30.
AvailableWork includes all site work and yard piping installation required to accommodate operations of the existing facility during construction of the proposed improvements, including bypass pumping the existing pump station, all electrical construction and equipment installation required to facilitate operations of existing equipment during construction of proposed improvements, all temporary pumps, piping, etc, required to maintain operation of the pump station during construction of proposed improvements, demolition of the existing pump station. See attached file.
Posted Date
Dec 31, 2025
Due Date
Feb 5, 2026
Release: Dec 31, 2025
Close: Feb 5, 2026
Work includes all site work and yard piping installation required to accommodate operations of the existing facility during construction of the proposed improvements, including bypass pumping the existing pump station, all electrical construction and equipment installation required to facilitate operations of existing equipment during construction of proposed improvements, all temporary pumps, piping, etc, required to maintain operation of the pump station during construction of proposed improvements, demolition of the existing pump station. See attached file.
AvailableThe Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
Posted Date
Dec 18, 2025
Due Date
Feb 5, 2026
Release: Dec 18, 2025
Close: Feb 5, 2026
The Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →