Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
North Huntingdon Township Municipal Authority (Westmoreland County, PA) is soliciting sealed bids via PennBid for the Larimer Pump Station Rehabilitation, with separate contracts for General/Mechanical (2025-03) and Electrical (2025-04) construction. Bids are due online by 10:00 AM EST on February 5, 2026, and the solicitation opened on December 31, 2025. Work is described in the project description and specifications prepared by KLH Engineers, and bidders must provide bid security, E-Verify documentation, and performance bonds.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of pump station rehabilitation. Work includes general/mechanical contract.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Project consists of pump station rehabilitation. Work includes general/mechanical contract.
AvailableThe Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
Posted Date
Dec 18, 2025
Due Date
Feb 5, 2026
The City of Hinesville is soliciting proposals to rehabilitate the Highway 196 Pump Station. Work will include upgrades/repairs to station equipment and associated site work; proposals are due January 14, 2026 at 2:00 PM ET.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
The City of Hinesville is soliciting proposals to rehabilitate the Highway 196 Pump Station. Work will include upgrades/repairs to station equipment and associated site work; proposals are due January 14, 2026 at 2:00 PM ET.
AvailableWork include pump station rehabilitation. Works includes electrical.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work include pump station rehabilitation. Works includes electrical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 5, 2026
The Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.