Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Marion County Water Authority
Work includes installation of approx 11,250 LF of new 6" water line by means of open-cut, and horizontal directional boring; 15 residential water meters; 3" master meter; gate valves and 2-1/8" hydrants; new pexa service lines; new curb stops; connection to existing water lines; all other necessary and incidental work.
Posted Date
Jul 3, 2026
Due Date
Jul 30, 2026
Release: Jul 3, 2026
Marion County Water Authority
Close: Jul 30, 2026
Work includes installation of approx 11,250 LF of new 6" water line by means of open-cut, and horizontal directional boring; 15 residential water meters; 3" master meter; gate valves and 2-1/8" hydrants; new pexa service lines; new curb stops; connection to existing water lines; all other necessary and incidental work.
AvailableMarion County Water Authority
The work approx. 7,250 LF 6” Class 250 PVC Pipe; 21,000 LF 3” Class 250 PVC; 5 Wet connections as per drawings; 2 Fire Hydrant assemblies used for flushing; 8 Flush Hydrants; Casing Pipe for Road Crossings; Service lines and meters.
Posted Date
Apr 29, 2026
Due Date
Jun 4, 2026
Release: Apr 29, 2026
Marion County Water Authority
Close: Jun 4, 2026
The work approx. 7,250 LF 6” Class 250 PVC Pipe; 21,000 LF 3” Class 250 PVC; 5 Wet connections as per drawings; 2 Fire Hydrant assemblies used for flushing; 8 Flush Hydrants; Casing Pipe for Road Crossings; Service lines and meters.
Marion County Water Authority
Work includes installation of new prepackaged water pump station, concrete pad, electrical installations, connection to existing water lines.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Marion County Water Authority
Close: Feb 10, 2026
Work includes installation of new prepackaged water pump station, concrete pad, electrical installations, connection to existing water lines.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge