CityCA
Posted
Sep 8, 2026
Oct 14, 2026
Playhouse Park EV Chargers Phase II Construction Project
Work includes expand and upgrade the existing electric vehicle charging infrastructure at playhouse park through the installation of new level 2 electric vehicle supply equipment, replacement of four existing level 2 chargers, associated electrical infrastructure, foundations, conduit, conductors, panelboard equipment, load management equipment, pavement/parking markings, and related site restoration; (10) 48a level 2 dual-port ev chargers (joint #ixp-e48-dual). ; (10) evse pedestals (joint #pab-05), painted green; (5) concrete foundations for evse pedestals, 48"l x 18"w x 12"d; (1) panelboard 'p2ev', 400a, 42ckt, 65kaic, nema3r, w/ (10) 60a circuit breakers and spd. See attached file.