Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work will generally consist of clearing, grubbing, seeding, concrete work, and all other work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct sidewalk along 36th Street from Colonel Glenn Road to Boyle Park Road.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Construct sidewalk along 36th Street from Colonel Glenn Road to Boyle Park Road.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Lebanon (Public Works - Engineering) is soliciting sealed bids for the Mechanic Street Sidewalk Project to construct a pedestrian sidewalk along the south side of Mechanic Street, including granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and roadway patching. A non-mandatory pre-proposal meeting is scheduled for January 14, 2026 at 10:00am ET and questions are due January 21, 2026; proposal submissions are due January 28, 2026 at 12:00pm ET. The posting includes project documents and plan attachments in the portal’s Downloads section and indicates sealed bids and bonding/insurance requirements.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
The City of Lebanon (Public Works - Engineering) is soliciting sealed bids for the Mechanic Street Sidewalk Project to construct a pedestrian sidewalk along the south side of Mechanic Street, including granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and roadway patching. A non-mandatory pre-proposal meeting is scheduled for January 14, 2026 at 10:00am ET and questions are due January 21, 2026; proposal submissions are due January 28, 2026 at 12:00pm ET. The posting includes project documents and plan attachments in the portal’s Downloads section and indicates sealed bids and bonding/insurance requirements.
AvailableConstruct 5' wide sidewalk to the existing sidewalk.
Posted Date
Jan 13, 2026
Due Date
Feb 18, 2026
Release: Jan 13, 2026
Close: Feb 18, 2026
Construct 5' wide sidewalk to the existing sidewalk.
AvailableConstruction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →