Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Little Rock issued an Invitation to Bid (ITB) for construction of the 36th Street Sidewalk to construct sidewalk along 36th Street from Colonel Glenn Road to Boyle Park Road. The ITB was posted on 2026-01-06 and is open with bids due 2026-01-27 at 2:00 PM CST; the project scope includes site preparation, excavation, concrete curb & gutter and sidewalks, retaining walls, storm drain work, sodding, traffic control, and related items. Bidders must hold an Arkansas State Contractor License, submit a 5% bid bond for bids over $50,000, provide the vendor qualifications form and proof of required insurance; supporting plans and contract documents are posted on the City’s procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Shelton, WA is inviting sealed bids for the Downtown Street Tree and Sidewalk Repair project (ITB #26-002-LPW). Work involves removal and replacement of select downtown street trees and associated sidewalk/curb repairs to address uplift and pedestrian safety. Bids open January 8, 2026 and are due by February 3, 2026 at 1:00 PM local time.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
The City of Shelton, WA is inviting sealed bids for the Downtown Street Tree and Sidewalk Repair project (ITB #26-002-LPW). Work involves removal and replacement of select downtown street trees and associated sidewalk/curb repairs to address uplift and pedestrian safety. Bids open January 8, 2026 and are due by February 3, 2026 at 1:00 PM local time.
AvailableConstruct a sidewalk. The sidewalk, crosswalk, and pedestrian ramps shall adhere to current ADA standards. Clearing, grubbing, and grading, utility relocation, concrete sidewalk 4" 3,000 psi, detectable crosswalk warning material, inlet protection systems, crosswalk ramps (ada ramps), driveway adjustments.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Construct a sidewalk. The sidewalk, crosswalk, and pedestrian ramps shall adhere to current ADA standards. Clearing, grubbing, and grading, utility relocation, concrete sidewalk 4" 3,000 psi, detectable crosswalk warning material, inlet protection systems, crosswalk ramps (ada ramps), driveway adjustments.
AvailableThe project includes the construction of approx. 1,061 feet of sidewalk and the re-construction of numerous driveways. Five-foot wide sidewalk will be constructed on: Morgan Combee Road from Combee Road to Woodland Avenue and Morganwood Drive to Ridge Lake Court (south and north side, respectively). Street lighting will be designed and installed by Lakeland Electric (LE). Existing utilities will be relocated and/or modified as needed. This project will meet FDOT Standards.
Posted Date
Dec 16, 2025
Due Date
Jan 28, 2026
Release: Dec 16, 2025
Close: Jan 28, 2026
The project includes the construction of approx. 1,061 feet of sidewalk and the re-construction of numerous driveways. Five-foot wide sidewalk will be constructed on: Morgan Combee Road from Combee Road to Woodland Avenue and Morganwood Drive to Ridge Lake Court (south and north side, respectively). Street lighting will be designed and installed by Lakeland Electric (LE). Existing utilities will be relocated and/or modified as needed. This project will meet FDOT Standards.
This Request for Bids is for the construction of bituminous sidewalk, granite curbing, shoulder reconstruction, pavement markings, signage, drainage improvements, landscaping, and other highway-related items.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
This Request for Bids is for the construction of bituminous sidewalk, granite curbing, shoulder reconstruction, pavement markings, signage, drainage improvements, landscaping, and other highway-related items.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →