Closing soon

Public Safety Building HVAC Equipment Replacement RFP

Description: Units shall be factory assembled and tested including leak testing of the DX coils, pressure testing of the refrigeration circuit, and run testing of the completed unit. Run test report shall be supplied with the unit in the service compartment’s literature pocket. Unit shall have decals and tags to indicate lifting and rigging, service areas and caution areas for safety and to assist service personnel. Unit components shall be labeled, including refrigeration system components and electrical and controls components. Estimated sound power levels (dB) shall be shown on the unit ratings sheet. Installation, Operation, and Maintenance manual shall be supplied within the unit. Laminated color-coded wiring diagram shall match factory installed wiring and shall be affixed to the interior of the control compartment’s hinged access door. Unit nameplate shall be provided in two locations on the unit, affixed to the exterior of the unit and affixed to the interior of the control compartment’s hinged access door.

Buyer
Essex County

County · NY, US

Released
Sep 25, 2026
Closes
Oct 13, 2026(13 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts