CountyNY
Posted
Sep 25, 2026
Oct 13, 2026
Public Safety Building HVAC Equipment Replacement RFP
Units shall be factory assembled and tested including leak testing of the DX coils, pressure testing of the refrigeration circuit, and run testing of the completed unit. Run test report shall be supplied with the unit in the service compartment’s literature pocket. Unit shall have decals and tags to indicate lifting and rigging, service areas and caution areas for safety and to assist service personnel. Unit components shall be labeled, including refrigeration system components and electrical and controls components. Estimated sound power levels (dB) shall be shown on the unit ratings sheet. Installation, Operation, and Maintenance manual shall be supplied within the unit. Laminated color-coded wiring diagram shall match factory installed wiring and shall be affixed to the interior of the control compartment’s hinged access door. Unit nameplate shall be provided in two locations on the unit, affixed to the exterior of the unit and affixed to the interior of the control compartment’s hinged access door.
