CityWA
Posted
-
Nov 19, 2026
PRV Replacements 2026 - Phase 1 PRV 108 RFP
The work includes Installing 1 new Pressure Reducing Valve Station, including vault and appurtenances, Constructing approx. 60 LF of ductile iron water mains, Excavation dewatering, Excavation shoring, Relocating existing utilities (as required), Restoring surface conditions, including asphalt trench patching and concrete sidewalks, Performing traffic control, Other work as required to complete the project.
