CountyFL
Jul 6, 2026
Closes
Aug 5, 2026
Construction Engineering and Inspection Services for Pine Ridge Road Corridor Improvements
Project will consist of "new jug-handle" intersection design at the pine ridge road/livingston road intersection that will direct southbound motorists wishing to turn left (east) through the main intersection and enter a loop ramp back to pine ridge road where they will head east through the main intersection. The project will include a conventional intersection at the pine ridge road/whippoorwill lane intersection, along with drainage improvements, sidewalk, and traffic signals.