CountyTX
Posted
Aug 29, 2026
Oct 15, 2026
Proposed Roadway Construction for East Bankhead Highway Widening - Part 1 RFP
Proposed roadway construction.
Description: Proposed roadway construction.
County · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyTX
Posted
Aug 29, 2026
Oct 15, 2026
Proposed roadway construction.
Arizona Department of Transportation
State AgencyAZ
Posted
-
Oct 23, 2026
Project consists of widening the existing roadway by constructing new asphalt concrete pavement. Additional work includes constructing curb and gutter and sidewalk, reconstructing curb ramp returns, and driveways, relocating property wall, constructing storm drain, relocating water facilities, installing street lighting, pavement marking, signing, seeding, and other miscellaneous work.
CityAZ
Posted
-
Oct 23, 2026
Arizona DOT's project record identifies APJ-0-(222)T as a City of Apache Junction project for roadway widening and storm-drain installation. The work covers Southern Avenue from Weekes Wash west of Mariposa Road to Tomahawk Road and Tomahawk Road from Southern Avenue to US 60, including new asphalt pavement, curb/gutter/sidewalk, storm-drain and utility work, street lighting, pavement marking, signing, and seeding. The official record shows a bid opening of 10/23/2026 11:00:00 AM and plans status Not Available/N/A; it is a construction solicitation, not a grant.
CityGA
Posted
Aug 17, 2026
Sep 15, 2026
The City of Winder is requesting bids for the BANKHEAD HIGHWAY HIGH PRESSURE NATURAL GAS MAIN EXTENSION (RFP/Project Number 250235). The work consists of installing approximately 9,650 linear feet of 4-inch high pressure steel gas main, 30 linear feet of 4-inch polyethylene gas main, and 150 linear feet of 2-inch high pressure steel gas main, together with trenched and untrenched installation, line valves, connections, regulator stations, and related appurtenances. The official posting presents this as an advertisement for construction bids rather than a grant program; the City will furnish the gas main, valves, fittings, and regulator stations, and bids are due at the City of Winder Utilities Department, 138 Sweetwater Trail, Winder, GA 30680, by September 15, 2026 at 10:00 a.m. local time.
Decision makers connected to this RFP from Parker County.